Aberdeen bathroom renovation specialists
Bathroom renovations are our bread and butter. Aberdeen has an incredibly varied housing stock — granite tenements in Rosemount, Edwardian villas in Cults, 1970s bungalows in Peterculter, 1990s executive homes in Milltimber, new-build ensuites in Newhills. Each needs a different renovation approach, and we've done hundreds of each.
What we don't do is rip-and-replace. A real bathroom renovation Aberdeen homeowners can rely on starts with proper design — understanding how the room is actually used, what the plumbing constraints are, and where the money is best spent for maximum impact.
What a full bathroom renovation includes
Every renovation covers full strip-out and disposal, layout changes and structural adjustments, new plumbing and electrics, waterproofing, full-height tiling, sanitaryware and tapware, extractor and lighting, underfloor heating (where specified), decoration and snagging.
Because every trade is in-house, we sequence renovation projects tightly. Most of our Aberdeen renovations are complete in 2 to 3 weeks — significantly faster than firms that rely on outside subcontractors.
Popular renovation styles in Aberdeen
The most requested Aberdeen bathroom renovation styles right now are matte granite-grey porcelain tiling with brushed brass fixtures, warm off-white ensuites with wall-hung sanitaryware, and full walk-in wet room conversions replacing tired 1990s shower-over-bath layouts.
Searching locally? See our dedicated pages for bathroom renovations near me and bathroom contractors near me — same team, same guarantees, focused on genuinely local service.
Aberdeen price guide
| Project type | From | To |
|---|---|---|
| Standard renovation (same layout) | £5,500 | £8,500 |
| Renovation with layout changes | £8,500 | £13,000 |
| Luxury full renovation | £13,000 | £22,000 |
| Tenement flat renovation | £6,500 | £11,000 |
Guide prices for Aberdeen & Aberdeenshire fully-fitted, ex-VAT. Every quote we send is fixed and itemised.
Why choose us
Design-led renovations
3D CAD visuals before a single tile is laid.
Structural changes handled
Move walls, relocate soil stacks, alter floor levels — all in-house.
Period property specialists
Sympathetic renovations in granite tenements and Victorian villas.
Fixed-price contracts
One agreed price, in writing, before we start.
Full aftercare
Written workmanship guarantee on every renovation.
Fast turnaround
Most renovations completed in 2–3 weeks.
Frequently asked questions
How do I find a good bathroom renovation company in Aberdeen?+
Look for an Aberdeen renovation firm with a genuine local address (not a virtual office), verified reviews from named local customers, in-house Gas Safe plumbers and NICEIC electricians, full public liability insurance, and a written workmanship guarantee. Ask to see recent renovations in your postcode and always insist on a fixed-price written contract before any work starts.
What's the difference between bathroom renovation and installation?+
An installation replaces the existing suite and finishes in the same layout. A renovation goes further — reworking the layout, moving plumbing, taking out baths for walk-in showers, and often replastering and rewiring. Renovations transform how a bathroom works, not just how it looks.
How much does a bathroom renovation cost in Aberdeen?+
A full bathroom renovation in Aberdeen typically costs £5,500 to £12,000. Renovations with layout changes and premium finishes run £8,500 to £13,000. Luxury renovations with underfloor heating, freestanding baths and bespoke joinery usually sit at £13,000 to £22,000. Tenement flat renovations start around £6,500. Every renovation quote is fixed, itemised and written.
How long does a bathroom renovation take?+
Full renovations usually take 2–3 weeks depending on the scope. Renovations that require replastering, layout changes or bespoke joinery may run to 4 weeks. Because every trade is in-house, we sequence works tightly and rarely lose days to subcontractor delays.
What should I expect during a renovation?+
Week one: strip-out, structural changes, first-fix plumbing, electrics and waterproofing. Week two: full tiling and second-fix. Week three: sanitaryware, tapware, decoration, silicone and snagging. Throughout, expect dust sheets across the home, floor protection on access routes, daily tidy-ups, and a lead tradesperson on site as your single point of contact. You'll get a written day-by-day schedule before we start.
How far ahead should I book a renovation?+
Aberdeen renovation lead times are typically 4–8 weeks from signed contract to start-on-site — longer at peak periods. Book your free survey as soon as you're seriously considering the project to lock in a slot and allow time for design decisions and material lead times.
Can you renovate a bathroom in a granite tenement flat?+
Yes — tenement renovations in Rosemount, Ferryhill, Mannofield and Old Aberdeen are one of our specialisms. We know how to work around tenement waste stacks, floor build-ups and sound insulation requirements.
Do I need to move out during the renovation?+
No. Most Aberdeen homeowners stay in the property throughout. If you only have one bathroom we can often schedule the works to keep water and a working toilet available most days.
Do you supply everything?+
Yes — sanitaryware, tapware, tiling, shower enclosures, vanity units, LED mirrors and accessories. Trade discount passed on so you get better quality for less.